Pexter contains Fipronil which is approved for control of Termite in pre and post construction at the rate of 0.25% concentration i.e. 100 ml formulated product diluted in 1 litre of water. Treatment should be as per IS 6313 (Part-2): 2001 for pre-constructional chemical treatment measures and IS 6313 (Part-3): 2001 for post-construction treatment of the existing building.
Specification
Name
Pexter
Composition
Fipronil 2.92% EC
Model of Action
Systemic
Category
Public Health Pesticides
Subcategory
Termite Control
Package
Features
FIRST AID
¨
If
the chemical is inhaled, get the victim into fresh air immediately. If
breathing is stopped, apply artificial respiration. If swallowed, induce
vomiting by tickling at the back of the throat with the finger. If the chemical
has splashed into the eyes, flush the eyes with plenty of cold water. In case
of skin contact, wash the skin with plenty of soap and water. Get medical
attention immediately.
SYMPTOMS OF POISONING:
¨
Mainly
consists of irritability, lethargy, muscle tremors and in extreme cases
convulsions may occur. Fipronil is a reversible GABA receptor inhibitor and
these symptoms are reversible after termination of exposure.
DIRECTION OF USE OF PEXTER
Pre-construction Treatment & Post-construction Treatment. Treatment should be as per IS 6313 (Part-2): 2001 for pre-constructional chemical treatment measures and IS 6313 (Part-3): 2001 for post-construction treatment of the existing building.
A) PRE-CONSTRUCTION TREATMENT
Treatment should be as per IS 6313 (Part-2): 2001 for Pre-construction treatment.
¨ Treatment of masonry foundation: Bottom surface and sides of foundation pits upto a height of 30 cm Should be treated @ 5 ltr Chemical solution per sq.mtr of surface area.
¨ Refill Earth: Back fill earth in immediate contact with the foundation structure should be treated @ 7.5 ltr per sq. mtr of the vertical surface of the substructure for each side.
¨ Treatment of RCC Foundation: Treatment should start at a depth of 50 cm below ground level @ 7.5 ltr per sq.mtr.
¨ Treatment of Top surface of plinth filling: The top surface of the consolidated earth within plinth walls shall be treated with Chemical solution at the rate of 5 ltr/m2 of the surface before the sand bed or sub-grade is laid.
¨ Soil treatment along external perimeter of building: Earth along the external walls of the building should be rodded at intervals of 15 cm and to a depth of 30 cm exposing the foundation wall surface chemical solution should be poured along the wall @ 7.5 ltr per sq.mtr of vertical surface.
¨ Treatment of soil under apron along external perimeter of building: Top surface of the earth over which the apron is to be laid shall be treated with chemical solution @ 5 ltr per sq.mtr of the vertical surface.
B) POST-CONSTRUCTION TREATMENT
Treatment should be as per IS 6313 (Part-3): 2001 for post-construction treatment.
¨ Soil treatment along external perimeter of building: Earth along the external walls of the building should be rodded at intervals of 15 cm and to a depth of 30 cm exposing the foundation wall surface chemical solution should be poured along the wall @ 7.5 ltr per sq.mtr of vertical surface.
¨ Treatment of soil under apron along external perimeter of building: Top surface of the earth over which the apron is to be laid shall be treated with chemical solution @ 5 ltr per sq.mtr of the vertical surface.
¨ Treatment of soil under floor: To prevent entry of termites from cracks, soil under floor should be treated. Drill 12 mm holes at the junction of floor and wall at 30 cm interval to reach the soil below. Squirt the chemical solution @1ltr. / Hole and seal.
¨ Treatment of voids in masonry: The movement of termites through masonry walls may be restricted by drilling holes in masonry wall at abot 45° angle preferably from both sides of the plinth wall at 30 cm interval and squirt the chemical in holes till refusal and seal the holes.
¨ Treatment of upper floors: In case of infestation in upper floors, treat ground floor of the existing building as described above.