Loading...

OZIER

OZIER

A slight breakage in the treated area, leaving the treated structure die without any initial symptoms. Ozier containing Imidacloprid 30.5% SC is new termiticide which break the concept of repellence and it is systemic & contact insecticide.

Specification

Name

OZIER

Composition

Imidacloprid 30.5% SC

Model of Action

Systemic

Category

Public Health Pesticides

Subcategory

Termite Control

Package

  • 50ml
  • 100ml
  • 250ml
  • 500ml
  • 1litre
  • 5litre
  • 25litre

Features

REASON TO CHOOSE OZIER AS TERMITICIDE:                

¨     Ozier has a lethal action on termite.

¨     Ozier has an ability to spread in the all direction of soil by a process called as Lateral Soil movement” which depend on soil moisture ensuring thorough soil coverage with no gaps whereas vertical soil movement in case of Chlorpyriphos.

¨     Ozier is odourless, low toxic and water-based formulation.

¨     Ozier dosage is very low i.e.2.1 ml in 1 litre of water with comparison to high dose of Chlorpyriphos 20 % EC i.e.50 ml in 1 litre of water.

¨     Ozier creates a non-detectable barrier which termite cannot detect whereas other conventional termiticide create detectable barrier which termite can detect and so termite avoid treated zone and look for gaps in the barrier to enter.

¨     Ozier LD50 value is 450 mg/kg and 135 mg/kg are of Chlorpyriphos so OZIER is very low toxic than Chlorpyriphos.

¨     Ozier remain intact for a longer time than other conventional termiticide which make ozier cost effective in the long term.

¨     Ozier can be applied in both pre and post construction treatment.

 

SYMPTOMS OF POISONING:

¨     Apathy, Myatonia, Tremor, Difficult breathing & Myospasms.

Usage

DOSAGE:

¨     2.1ml formulated Ozier diluted in 1 Litre of water.

 

HOW TO USE OZIER: 

Pre-construction Treatment & Post-construction Treatment. Treatment should be as per IS 6313 (Part-2): 2001 for pre-constructional chemical treatment measures and IS 6313 (Part-3): 2001 for post-construction treatment of the existing building.

A.   PRE-CONSTRUCTION TREATMENT

For thermal fogging the product can be applied through hand carried thermal foggers, pulse jet or friction plate.

     Treatment should be as per IS 6313 (Part-2) : 2001 for Pre-construction        treatment.

¨     Treatment of masonry foundation:  Bottom surface and sides of foundation pits upto a height of 30 cm Should be treated @ 5 ltr Chemical solution per sq.mtr of surface area.

¨     Refill Earth: Back fill earth in immediate contact with the foundation structure should be treated @ 7.5 ltr per sq. mtr of the vertical surface of the substructure for each side.

¨     Treatment of RCC Foundation: Treatment should start at a depth of 50 cm below ground level @ 7.5 ltr per sq.mtr.

¨     Treatment of Top surface of plinth filling: The top surface of the       consolidated earth within plinth walls shall be treated with Chemical       solution at the rate of 5 ltr/m2 of the surface before the sand bed or sub-grade is laid.

¨     Soil treatment along external perimeter of building: Earth along the external       walls of the building should be rodded at intervals of 15 cm and to a depth of 30 cm exposing the foundation wall surface chemical solution should be poured along the wall @ 7.5 ltr per sq.mtr of vertical surface.

¨     Treatment of soil under apron along external perimeter of building: Top       surface of the earth over which the apron is to be laid shall be treated with chemical solution @ 5 ltr per sq.mtr of the vertical surface.   

 

B.       POST-CONSTRUCTION TREATMENT

Treatment should be as per IS 6313 (Part-3) : 2001 for Post-construction treatment.

¨     Soil treatment along external perimeter of building: Earth along the external walls of the building should be rodded at intervals of 15 cm and to a depth of 30 cm exposing the foundation wall surface. chemical solution should be poured along the wall @ 7.5 ltr per sq.mtr of vertical surface.

¨     Treatment of soil under apron along external perimeter of building: Top surface of the earth over which the apron is to be laid shall be treated with chemical solution @ 5 ltr per sq.mtr of the vertical surface.

¨     Treatment of soil under floor: To prevent entry of termites from cracks, soil under floor should be treated. Drill

¨     12 mm holes at the junction of floor and wall at 30 cm interval to reach the soil below. Squirt the chemical solution @1ltr./ hole and seal.

¨     Treatment of voids in masonry: The movement of termites throughmasonry walls may be restricted by drilling holes in masonry wall at about  45° angle preferably from both sides of the plinth wall at 30 cm interval and squirt the chemical in holes till refusal and seal the holes.

¨     Treatment of upper floors: In case of infestation in upper floors, treat ground floor of the existing building as described above.

 

More Products

Bifenthrin 2.5% EC
Fipronil 2.92% EC